2013, Marine and Risk Consultants Ltd., MARICO, Skerries Tidal Site, Navigation Risk Assessment of L3 Cable Route and Landfall for Skerries Tidal Array, Report

Abstract

This study assesses the navigational risk of installing an export cable route from the Skerries Tidal Array and complements the existing Navigation Risk Assessment
The assessment was undertaken utilising the Formal Safety Assessment approach adopted by the International Maritime Organisation. The analysis uitilised a number of data sources including vessel traffic surveys, records of consultation with relevant stakeholders undertaken during the Navigation Risk Assessment and a desktop literature review.

Originator Skerries
Access MDE
Date 15/05/2013
Keywords Offshore Cable Corridor, Renewable Energy Lease Area, Pre-Construction monitoring, Boat, Navigation, Shipping, Ferry, Hazards to navigation, Human Activity, Report